Engineering, Procurement, Installation and Commissioning of Desalinated Water Network Phase II at Ras Laffan.

Project Status

Completed

Client

Qatar Petroleum

Term of Contract

2007 – 2009

Location

Ras Laffan
EPC-project-06-3
EPC-project-06-2
EPC-project-06-1

This EPIC Contract construction of site survey, topographic survey, detailed design & engineering, procurement of materials such as MOV PCV, manual valves, electrical & instrumentation materials, civil works such as temporary facilities, leveling/grading, pipeline trench; excavation / micro tunneling, construction of valve chamber, micro tunneling, product corridor crossing, pipeline crossing, pipeline installation, instrumentation & control installation, testing of electrical & instrumentation/control systems, sterilization of pipeline, pre-commissioning and commissioning (about 15 KM buried pipeline network of 36 inch Dia to 24-inch dia GRP).

© 1981-2020 Black Cat Engineering & Construction W.L.L

© 1981-2021 Black Cat Engineering & Construction W.L.L – Web Design & Development by Cxessentials