Engineering, Procurement, Installation and Commissioning for Replacement of V-2003 and Installation of Air Coolers at NGL-2 Mesaieed

Project Status

Completed

Client

Qatar Petroleum

Term of Contract

2007 – 2012

Location

Mesaieed, Qatar
EPC-project-11-2

Design and detailed engineering, procurement of all materials including glycol separators V-2003 and air coolers E-2410/S. The construction consists of earthworks, excavations, concrete foundations, structural steel, fabrication and erection of access road,