Project Status
Client
Term of Contract
Location
The new Flowlines / Spur lines installation requires the following associated works construction of ROW, concrete pipe supports, anchors; Culverts at various crossings; micro tunneling at major road crossings, etc; NDT, Hydrotesting, drying and N2 purging of flowlines; Internal HDPE liner installation in spur lines; Painting of flow lines/ Spur lines; Pre- commissioning / Commissioning of flow lines/Spur lines.
© 1981-2020 Black Cat Engineering & Construction W.L.L
© 1981-2021 Black Cat Engineering & Construction W.L.L – Web Design & Development by Cxessentials